Poor reinstatement left trench across path

Please sign in to vote.

Added by Donald Noble

A trench has been dug across the cycle path close to the substation, and has not been properly reinstated, leaving a 0.5m wide 5cm deep rut right across the tarmac path,

This should have been reinstated properly at the time, but would be good if it could be fixed soon

Location

Issues nearby
Back to top