A16 Norwood Improvements - development of 80-hectare site

Please sign in to vote.

Added by Rosamund Humphrey (Admin Officer)

The Peterborough Local Plan identifies the required delivery of 19,440 new homes and 17,600 new jobs by 2036.

The 80-hectare Norwood site will provide 2,000 dwellings, a local centre and primary school. Delivery of the development has been sl=plit into two phases. The first phase includes up to 870 dwellings and auxiliary uses, including a primary school and local centre, and will initially be accessed via Newborough Road. The second phase will complete the build. 

Development of 945 dewellings, a local centre, a primary school and a secondary school has already begun at the Paston Reserve (adjacent to the Norwood site).

The project requires improvements along the A16 corridor including a new access roundabout with the A16 and a new junction with Newborough Road. The plan is to connect the two points of access with an internal road. 

Highways England have agreed in principle to the proposed interventions.  

Location

Issues nearby
Back to top